Testing of fitters - Slovnaft

Testing of fitters - Slovnaft

Based on the request of Slovnaft as, external workers from the assembly of flange joints were inspected before the shutdown of 2019 between 23 and 30 April and 9 May 2019 .

The testing took place on training flanges . The individual steps of safe disassembly and subsequent assembly of the PS were evaluated. Great emphasis was placed on the inspection of the bearing surfaces, the condition of the connecting material and seals, as well as on the lubrication of the connecting material, the installation of the seals and the subsequent controlled tightening. The fitters performed tightening according to the cross rule with the specified tightening torque in 4 steps with a torque wrench. The individual steps of the safe disassembly and assembly procedure were scored and finally evaluated together with the pressure test.

The purpose of the evaluation was an overall assessment of the assembly capabilities of the installer. If the examinee did not have a basic knowledge of the installation of the PS, he did not pass the test.

Around 10 companies from about 5 countries were registered.

A total of 263 fitters took part in the tests, of which 22 failed.

Send a message

Yellow underlined fields are required.

We offer our goods and services only to B2B customers. The minimum order value is EUR 40.

+420 532 196 711

Mon - Thu: 7:30 - 16:00
Fri: 7:30 - 14:00

info@pokornyindustries.com

We will be happy to answer your questions

Trnkova 2788/115

628 00 Brno, Czech Republic