Final audit and flange joint management (Flange Management System)

Final audit and flange joint management (Flange Management System)

Comprehensive quality management for the assembly of flanged joints in accordance with EN 1591-4 includes maintaining a flange dossier for every critical flange in the plant.

1. Preparation and specifications

Calculation of tightening torques in accordance with EN 1591-1, gasket selection and verification of fastener compatibility.

2. Inspection and assembly

Inspection of sealing surfaces, cleaning and lubrication of threads, and controlled assembly by a certified assembler in accordance with EN 1591-4, including recording the details in a report.

3. Pressure testing and acceptance

Hydrostatic or pneumatic testing with leak detection (sniffer / foaming agent) in accordance with TA-Luft.

4. Operational monitoring

Regular emissions inspections (LDAR – Leak Detection and Repair) throughout the equipment’s entire lifecycle.

Are you ready to put your seal selection worries behind you? Contact us

and get valuable advice and information on industrial seals

Logo Pokorny Industries

Pokorny Industries Partnership in quality

All prices excluding VAT

© Pokorny industries s.r.o. 2026 - all rights reserved

Made by servisdesign